Case study · Drone inspection · Industrial chimney
Radiometric thermal imaging, RGB and thermal 3D models and a total-station cross-check located 59 defects on a reinforced-concrete stack, including hot flue gas escaping at four levels and a 0.535 m lean. The chimney stayed in service throughout, and nobody had to work at height to collect the data.

Also: 2,419 photographs and 61 minutes of visible and thermal video; measured height 79.3 m, 4.3 m more than the records show.
The client needed the chimney’s true condition: the concrete shell, hotspots and gas leakage, height and verticality, the platforms, ladder, cap and fixings, and how long it can safely stay in service.
It could not be shut down. Close inspection of a stack this tall normally means rope access or scaffolding beside hot flue gas, and gives spot observations rather than a complete, measurable record.
Overall condition: poor, serviceable in the short term only with urgent action. Instead of a list of observations, the client received a prioritised, time-bound action plan.
Without major works the shell has an estimated 11 years (8–15) of service life left; rehabilitation by 2028 would extend this to about 2050–2055.
Method
2,419 photographs
The drone flew vertical strips from 1 m to 86 m at 6–25 m stand-off: 1,198 visible and 1,221 radiometric thermal photographs, 61 minutes of video and a laser range on every frame. The hot gas made every leak visible.
2,399 of 2,419 frames placed
Each photograph was registered on the tapered, leaning shell from the same-day total-station survey, giving RGB and thermal 3D models and unwrapped maps at 5 mm and 15 mm per pixel.
131 hotspots confirmed
Each hotspot was seen in at least three views and at least 10 °C above its surroundings. Cracks were mapped on the orthomosaic, and every photograph and both videos were reviewed.
15 survey levels
Total-station measurements were turned into deviation angles and A3 CAD drawings, and checked independently against the drone’s laser-rangefinder data.
59 anomalies rated
Each anomaly was located by height and bearing, rated from 1 (minor) to 4 (critical), illustrated and linked to an action and time frame.
Mapped shell
Every point on the unwrapped maps has a height and a compass bearing. The 131 confirmed hotspots are circled; the leaking opening rows show as bright bands.


Findings
The shell is in poor condition, and the stack is serviceable in the short term only with urgent action.
93 openings in four rows, at about 38, 48, 58 and 68 m, were leaking gas, 44 of them above the thermal camera’s 140 °C range. The leakage indicates that the liner or its seals have failed, and cracking and rust staining were worst at exactly these rows.
At 74 m the stack is 0.535 m off vertical (1 in 139, 0.41°). The axis is straight, so this is a rigid tilt of 3.6 to 7 times typical construction tolerance. Repeat surveys were recommended to establish whether it is still moving.
The measured height to the top of the steel cap is 79.3 m (±0.7 m), 4.3 m more than the 75 m in the records.
A platform beam perforated by corrosion (a 150–200 mm hole through the web), a missing anchor on the top collar, a sampling-port flange held by one of its eight bolts, missing fasteners on the steel cap and defects in the lightning protection.
A loose 0.5 m patch of concrete under the top deck, flaking paint and plaster, and loose objects on a platform.
An average zone rating of 3.2 out of 5, with cracking and rust bleeding concentrated at the leaking rows, between 60 and 71 m and near the base.

Evidence
Every item in the register comes with annotated photographs like these.

Cracks with rust staining
Around the openings of the ≈38 m row: probable corrosion of the reinforcement.

Perforated platform beam
A 150–200 mm corrosion hole through the web of a platform beam (video frame).

Flange on one of eight bolts
A sampling-port blind flange held by a single bolt (telephoto).

Loose concrete under the top deck
A loose, delaminated 0.5 m patch: a falling hazard (video frame).
Verticality
Shell-centre offsets were measured at 15 levels with a total station. The best-fit line is straight, so the whole stack is tilted rather than bent: 0.535 m at 74 m, towards the north-east.
That is well outside the H/1000 and H/500 tolerance lines, so repeat surveys at 3 and 9 months were recommended to confirm whether it is still moving.

Deliverables


Action plan
The register sorts the findings into time frames, so the client can plan safety measures, shutdown work and repairs straight from it.
Now
Make safe
Close the affected platform, limit access to the top platform and barricade the drop zone below it.
Within a month
Remove hazards
Remove loose concrete, replace missing anchors and fasteners, and clear loose objects.
Next shutdown
Inspect the liner
Inspect the liner from inside and plan the repair of the leaking openings.
At 3 and 9 months
Re-survey the lean
Repeat the verticality survey to confirm whether the lean is stable.
Within two years
Rehabilitate
Targeted concrete testing, then concrete repair, protective coating and replacement of corroded platform steel.
The 3D models, maps and registers form a measured baseline, so the next survey can show exactly what has changed.
Why a drone survey
Services used

Visual and radiometric thermal inspection of towers, turbines, solar plants, stacks and structures while they stay in service. High zoom shows the…
1,500+ utility assets inspected
Explore the service
Send us the images, LiDAR or thermal data your team has flown, or let our crews fly it. We process it into orthomosaics, elevation models, point…
Explore the service
One GIS team for the whole job: smart city digitisation, data annotation for AI models, AI-assisted feature extraction and change detection, and the…
24,000+ properties geo-tagged in one municipal project
Explore the serviceFigures are from the inspection report for the survey of 17 October 2026. The client’s name and the chimney’s location are withheld.
We survey the structure while it runs, map every defect in 3D and deliver a rated register with an action plan.